Cloud Aggregator

Guide
k
Getting Started
Secure Environment Access
Fetch Available Games
Game Launch Flow
In Game Transactions Call
Integration Checklist
Response Status Codes
Videos Gallery
Test Cases

Integration Checklist


Use this checklist to track progress through your CloudAggregator integration:


#

Checklist Item

Notes

1

Obtain Operator ID and API key from CloudAggregator.

Contact your integration manager.

2

Register accepted currencies with CloudAggregator.

Provide a full list of ISO 4217 codes.

3

Provide wallet endpoint URL to CloudAggregator.

Must be HTTPS with valid TLS 1.2+ certificate.

4

Configure IP allowlist on your firewall for CloudAggregator callback IPs.

Request current IP list from your integration manager.

5

Implement X-CA-Signature validation on all incoming callbacks.

Use the shared secret provided during onboarding.

6

Implement GetAccount endpoint.

Handle all required response fields.

7

Implement GetBalance endpoint.

Return real_balance, bonus_balance, and balance.

8

Implement Wager endpoint with idempotency.

Test duplicate request handling.

9

Implement Result endpoint.

Must accept results for expired sessions (never return 1000).

10

Implement WagerAndResult endpoint.

Required for Rummy, Bingo, Lottery.

11

Implement Rollback endpoint.

Required for Slots, Live Casino. Handle by transaction_id alone.

12

Implement Jackpot endpoint.

Required for Bingo and progressive slot titles.

13

Implement Rollback on Result (reversewin) endpoint.

Required for Sports Book.

14

Test all error codes and verify correct HTTP 200 with appropriate code in body.

All responses return HTTP 200; error is in the code field.

15

Test idempotency for all transaction types.

Send same request twice; verify identical response.

16

Implement UKGC reality check parameters.

Required for UKGC-licensed Operators.

17

Verify responsible gaming limit enforcement in Wager endpoint.

Test codes 1006, 1019, 1035.

18

Complete CloudAggregator UAT (User Acceptance Testing) in the staging environment.

Coordinate with your integration manager.

19

Complete production go-live checklist with CloudAggregator.

Final sign-off required before go-live.